Main INDEX
Monthly INDEX
PREV
NEXT
User name Moffit
Log entry time 00:40:05 on April 07, 2008
Entry number 230463
Followups:
keyword=Access activity
Xin and Brad spent some time debugging the trouble with chamber 2.
Determined that removal of the 2U13 card allowed for ramping up the full
HV (-1600V). Could be a short between a field and signal wire.
These sets of wires are in the corner of the acceptance.. so not such a
big hit.
Alex reset Right Q2.
Moved the ribbon cable for 2U'11 to ROC10, Slot 5 ch79-64.