Swing shift summary.
David Hamilton (SL)
Nikos Sparveris (TO)
Kevin Fissum (3rd)
16:00 - shift started with no beam. MCC are tuning into Hall C.
16:40 - MCC called to say that the magnet experts need another hour
before beam can be restored to the hall.
17:30 - Hall status changed to controlled access to allow Brad to go into
the hall.
18:15 - Brad finished installing a camera on the BB helium bag gas
bubbler. Hall status is changed back to beam permit.
18:20 - HRSl moved into position for elastic data-taking (35.5 degrees,
969.3 MeV/c) for BB HV MWDC scan. Awaiting beam.
19:00 - beam restored to hall.
Target changed to 6cm LH2.
BB is still at 390A and 54 degrees.
Request 5 microamps with raster off.
Run 2497 - 2499, 2501, 2502, 2510 were junk due to BB HV trip caused by
bad beam alignment.
Run 2500 - 1550V threshold +5V, 200k - replay ok
Run 2503 - 1550V threshold +7.5V, 150k
Run 2504 - 1550V threshold +10V, 150k
Run 2505 - 1600V threshold +10V, 150k
Run 2506 - 1600V threshold +7.5V, 150k
Run 2507 - 1600V threshold +5V, 150k - replay ok
Run 2508 - 1500V threshold +5V, 150k
Run 2509 - 1500V threshold +7.5V, 150k
Run 2511 - 1500V threshold +10V, 150k - replay ok
Run 2512 - 1450V threshold +10V, 150k
Run 2513 - 1450V threshold +7.5V, 150k
Run 2514 - 1450V threshold +5V, 140k
Run 2515 - 1400V threshold +5V, 150k - replay ok
(comment line in header is wrong for 2515)
Run 2516 - 1400V threshold +7.5V, 150k
Run 2517 - 1400V threshold +10V, 150k
21:30 - BB MWDC HV-threshold scan complete.
BB field switched to 0A.
0.5 microamps requested, raster off, fast FB off.
Run 2518 - 1400V threshold +5V, 150k, BB I 0A
Run 2520 - 1450V threshold +5V, 150k, BB I 0A
22:00 - BB current switched back to 390A. Short BB MWDC HV/threshold scan
with T3 events. 5 microamps.
Run 2524 - 1550V threshold +5V, 670k, BB 390A, T3 - replay ok
Run 2525 - 1550V threshold +7.5V, 500k, BB 390A, T3
Run 2528 - 1550V threshold +10V, 590k, BB 390A, T3
22.40 - Set beam current to 3 microamps, MWDC HV 1550V threshold 5V BB 390A.
Run 2529 - 1550V threshold +5V, 0.29M, BB 390A, T3, current 3 microamps
Run 2531 - 1550V threshold +5V, 0.27M, BB 390A, T3, beam 1 microamp
23:00 - BB coil current set to 200A
Run 2532 - 1550V threshold +5V, 0.3M, BB 200A, T3, beam 1 microamp
23:10 - BB coil current set to 600A
Run 2533 - 1550V threshold +5V, 0.3M, BB 600A, T3, beam 3 microamps
23:20 - BB coil current set to 700A
Run 2534 - 1550V threshold +5V, 0.3M, BB 700A, T3, beam 3 microamps
23:50 - HRSl set to 1194 MeV/c (Q2 and Q3 cycled through 1400A) and 16.5
degrees (kinematics 2).
Target moved to Ta for elastic calibration data.
Requested beam at 5 microamps, FFB on, raster off.
Run 2535 - HRSl singles, Ta elastic run, 150k.
Shift ended during move to C target for short elastic run.