    Log entry time 00:05:54 on April 9,2008

    Entry number 230803

    keyword=Swing shift summary

    Shift started with no beam due to accelerator problems.

    21:20 - Eugene managed to make one Moller measurement.

    The downtime has been caused by a failure of the power supply on the arc 1A magnet. A team is trying to replace blown capacitors in the PSU. If they are unsuccessful, it is likely that the entire unit will have to be replaced in the morning.

    Shift ended with no beam.