• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ramesh

    Log entry time 16:17:29 on April20,2008

    Entry number 233391

    keyword=Energy Strip chart (late entry)

    For about 24 minutes (15:10 to 15:34), hall A beam energy ramped up gradually for about 80 keV due to hall C being down for their access. After complaining to MCC, they changed the energy lock to hall A and after that the energy has been nicely constant. We were expecting the energy lock would have to go to hall A, by default, whenever the hall C is down for sometime; unfortunately, it did not happen.


    FIGURE 1