    Hall A

    04/26/08 1600-2400
    Experiment #: E04-007
    Shift Leader: Ramesh Subedi
    Shift Workers: Chiranjib Dutta, Abdurahim Rakhman

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.450.560.870.090.760.740.660.834.95
    Beam Available
    but Not in Use
    0.410.420.110.800.210.180.280.082.48
    Beam Not Available
    or Unacceptable
    0.150.020.020.110.030.080.070.090.57
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.001.001.001.001.001.001.001.008.00
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: Besides the time spent during some BigBite high voltage trip recovery, and the target change for Al dummy (between 17:00 to 18:00 and 20:00 to 21:00) , it was a smooth sailing with excellent beam.

    Data Entry by: Ramesh Subedi