Main INDEX
Monthly INDEX
PREV
NEXT
User name Lindgren
Log entry time 10:52:30 on April27,2008
Entry number 235092
keyword=Setting up for kinematics L
10:40
Todd moved to LHRS=12.5
Brad tied up a cable to red light fixture so it would not get hung up in the HRS movement
Changed ethan/argon tank. Set to 12 psi
Did not change Helium tank.
Balloons have not been filled in 64 hours. Too Long.
BigBite spec balloon sagging badly away from pole faces. at least 10 cm on each side at about 20 cm into pole face.
MWDC balloon also sagging.
Filled both balloons
Return to counting house
Setting up for kinematics L
Recylced Q2 and Q3 to 1400 A
Set P=1.194
Beam cuurent = 3 ua
Set prescales ps1=3600,ps2=11800,ps3=4,ps4=1,ps5=1,ps6=1,ps7=330,ps8=100
Request MCC to Mask target
Run 4110 Tantalum elastic done 0.5M events
Run 20781 8500 events
Request MMC to Mask target
Change to carbon target