• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Y. Zhang

    Log entry time 00:03:10 on April29,2008

    Entry number 235626

    keyword=swing shift summary

    Swing shift summary April 28,2008

    SL : Yi Zhang
    TO : Chiranjib Dutta
    3rd : Simon Sirca

    Summary
    ========


    16:00 shift start
    16:05 move target to empty to do Moller measure.
    16:50 Moller measurements is canceled as DAQ does not work.
    16:55 chang target to Dummy to have 2 1-M-events runs.
    17:30 move target to loop1 LH2 6cm to start production run
    18:30 MCC call us beam will be off for a short while.
    18:51 MCC call us beam is back.
    21:30 ask control access to move BigBite to 48 degree and move target to Carbon
    22:05 ask for beam, 3 uA at first.
    22:51 change target to LH2, 3uA beam



    run sheet
    ==========
    target: Dummy
    16:54 ----> Run# 4289 ; events = 1 M

    16:54 ----> Run# 20794 ; events = 50396 right HRS run

    17:10 ----> Run# 4290 ; events = 1 M


    target: loop 1 LH2 6cm
    17:39 ----> Run# 4291 ; events = 1 M
    17:53 ----> Run# 4292 ; events = 1 M
    18:02 ----> Run# 4293 ; events = 1 M long beam triped during this run
    18:51 ----> Run# 4294 ; events = 1 M
    19:00 ----> Run# 4295 ; events = 1 M
    19:12 ----> Run# 4296 ; events = 1 M
    19:21 ----> Run# 4297 ; events = 1 M
    19:35 ----> Run# 4298 ; events = 1 M
    19:44 ----> Run# 4299 ; events = 1 M
    19:54 ----> Run# 4300 ; events = 1 M
    20:04 ----> Run# 4301 ; events = 1 M
    20:13 ----> Run# 4302 ; events = 1 M
    20:13 ----> Run# 20796 ; events = 1 M right HRS run
    20:25 ----> Run# 4303 ; events = 1 M
    20:34 ----> Run# 4304 ; events = 1 M
    20:44 ----> Run# 4305 ; events = 1 M
    20:54 ----> Run# 4306 ; events = 1 M
    21:03 ----> Run# 4307 ; events = 1 M
    21:13 ----> Run# 4308 ; events = 1 M
    21:21 ----> Run# 4309 ; events = 1 M


    target: Carbon
    22:10 ----> Run# 4310 ; junk run, to set prescales
    22:13 ----> Run# 4311 ; events = 1M during this run at 450k events, BPMA x changed form -1.4 to -0.8. After 525k events, BPMA x=-0.8


    target: loop 1 LH2 6cm
    22:51 ----> Run# 4312 ; junk run, to set prescales
    22:54 ----> Run# 4313 ; events = 1 M
    23:03 ----> Run# 4314 ; events = 1 M
    23:13 ----> Run# 4315 ; events = 1 M
    23:22 ----> Run# 4316 ; events = 1 M
    23:32 ----> Run# 4317 ; events = 1 M
    23:41 ----> Run# 4318 ; events = 1 M
    23:50 ----> Run# 4319 ; events = 1 M
    00:00 ----> Run# 4320 ; events = 1 M