Kinematics E
4/29/08
run events mC sum mC comment
4369 1M, 2.686mC 75.098 Al 6cm dummy
4370 1M 1.351 76.449
4371 1M 1.368 77.817
4372 1M 1.346 79.163
4373 1M 1.347 80.51
4374 1M 1.352 81.862
4375 1M 1.372 83.234
4376 0.9 84.134
4377 1M 1.353 85.487 BB HV trip
4378 1M 1.356 86.843
4379 1M 1.362 88.205
4380 0.321 88.526 end for beam studies
Beam studies from 10am. Original ETA 2pm. Still no beam at end of shift.
Took opportunistic controlled access from about 10:30am - 3:30am to move spectrometers, refill BigBite He bags, and diagnose Moller problems (sucessfully).
Runs 4381-4386 are DAQ tests (see halog), taken during beam studies.