Main INDEX
Monthly INDEX
PREV
NEXT
User name S. Sirca
Log entry time 23:56:24 on April29,2008
Entry number 235872
keyword=Swing shift summary
Swing shift summary | S. Sirca (SL), D. Armstrong (TO), C. Dutta (3rd)
======================================================================
Events
------
16:00 No beam upon start of shift (ongoing beam studies)
17:45 Beam is back, target is Ta
18:20 Insert C target
18:50 Insert LH2 target
18:55 BB MWDC HV trip (S16), recover in 10 minutes
19:38 Start ramp down of HRSL momentum to 0.997 MeV/c for kinematics C-III
19:51 Ready for production running in kinematics C-III
20:30 Problems restoring HRSL HV (mainframe 7)
21:10 Request hall access to reset HV crate
22:10 Request beam again
23:55 Beam away for PSS issues that can not be cleared
Runs
----
18:04 4387 3.0 uA on Ta (run to set prescales)
18:08 4388 0.5M 3.0 uA on Ta
18:23 4389 3.0 uA on C (run to set prescales, see HALOG 235822)
18:28 4390 3.0 uA on C
18:35 4391 0.5M 2.0 uA on C
19:10 4392 3.5 uA on LH2 (run to set prescales)
19:14 4393 3.5 uA on LH2 (run to set prescales)
19:17 4394 3.5 uA on LH2 (run to set prescales)
19:21 4395 3.5 uA on LH2
19:52 4396 3.5 uA on LH2 (PS test)
19:55 4397 3.5 uA on LH2
20:09 4398 1.0M 3.5 uA on LH2
20:24 4399 1.0M 3.5 uA on LH2
20:39 4400 0.2M 3.5 uA on LH2 (NB start of HRSL HV problems)
22:39 4401 0.7M 3.5 uA on LH2 (NB after HV problems resolved)
22:43 4402 1.0M 3.5 uA on LH2
22:58 4403 1.0M 3.5 uA on LH2
23:10 4404 1.0M 3.5 uA on LH2
23:25 4405 1.0M 3.5 uA on LH2
23:39 4406 1.0M 3.5 uA on LH2 beam is off