Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 00:07:47 on May 02, 2008
Entry number 236342
Followups:
keyword=Shift Summary (swing)
Swing Shift 5/1/08
J. LeRose (SL)
C. Dutta (To)
Y. Qiang (3rd)
Program is production running Kinematics F
Keep going until we get to 0.5C (total for kin F)
(at 21:45 estimate 16 hours more needed to get to 0.5C)
then switch to collimated LH2 target
BigBite at 48 degrees, (setpoint 390. readback 388.1)
Left HRS 14.5 degrees, 0.997 GeV/c
Right HRS 105 degrees, 0.4596 GeV/c
Beam 1.192 GeV, 3.4 microAmps
~16:27 BB HV trip
19:56-20:03 Change to Al dummy target
20:46-20:52 Change to LH2 target
23:03-23:10 BB HV trip during run 4553
production runs LH2
16:08 20833
16:08 4520 (analyzed)
16:19 4521 (BB HV trip at end) (analyzed)
16:33 4522
16:45 4523 (analyzed)
16:56 4524
17:06 4525 (analyzed)
17:17 4526
17:28 4527 (analyzed)
17:40 4528
17:52 4529 (analyzed)
18:02 4530
18:15 4531 (analyzed)
18:15 20834
18:25 4532
18:36 4533 (analyzed)
18:47 4534
18:59 4535 (analyzed)
19:10 4536
19:21 4537 (analyzed)
19:35 4538
19:46 4539 (analyzed)
Aluminum dummy target runs
20:05 4540 (analzed)
20:05 20835
20:27 4541
production runs LH2
20:53 4542
20:53 20836
21:04 4543 (analyzed)
21:17 4544
21:28 4545 (analyzed)
21:40 4546
21:50 4547 (analyzed)
22:03 4548
22:13 4549 (analyzed)
22:24 4550
22:35 4551 (analyzed)
22:46 4552
22:57 4553 BB HV trip (analyzed)