Main INDEX
Monthly INDEX
PREV
NEXT
User name Yi Zhang
Log entry time 00:06:34 on May 3,2008
Entry number 236552
keyword=Swing shift summary
Swing shift summary
SL:Yi Zhang
To: Abdurahim Rakhman
3rd:Tharanga Jinasundera
16:00 Swing shift starts. Dummy run at the beginning.
16:20 After Dummy run, we call MCC for control access to move BB and put in BB sieve slit.
Meanwhile we also call Jian-ping to cool down LD2 target and move LHRS to elastic angle 35.5,
cycle Q2 and Q3 quads and set the momentum to 1147 MeV/C.
15:50 After finish all those stuff, we move target to carbon and start calibration run.
18:03 Chang LHRS momentum to 0.96540 GeV/C for elastic peak.
18:17 call MCC to chang target to 6cm Deuterium and start production run
20:00 call MCC to Change target ot 6cm LH2
20:48 ask for control access to move sieve slit out
21:29 move target to carbon and take calibration data
22:14 move target to Deuterium and take calibration data.
22:33 BB HV triped, stop taking data
23:59 shift end
_______________________________________________________________________
Run list
left
4620 16:03 16:38 Dummy 0.47M
4621 17:49 18:04 C 56k
4622 18:12 C junk
4623 18:31 18:35 LD2 junk
4624 18:37 19:02 LD2 0.648M
4625 19:04 19:24 LD2 0.181M
4626 19:26 20:00 LD2 0.549
4627 20:08 20:34 LD2 0.500M
4628 20:34 21:04 LD2 30 k
4629 21:44 21:52 C 100 k
4630 21:52 22:11 C 205 k
4631 22:20 22:34 LD2 BB HV triped
right HRS
20843 17:49 18:04 C 14880
20844 18:12 C junk
20845 18:31 18:35 LD2 junk
20846 18:39 20:00 LD2 0.181M
20847 20:08 21:10 LD2 90k
20848 21:45 22:12 C 26k
20849 22:19 23:00 LD2 49k