Main INDEX
Monthly INDEX
PREV
NEXT
User name Lindgren
Log entry time 16:08:20 on May 3,2008
Entry number 236724
keyword=Day Shift Summary
Day Shift 8:00 AM
R. Lindgren SL
Youcai Wang TO
Franco Garibaldi 3rd
Target LH2
Beam 4 ua
Hrs=16.5 Deg P=1.1338
BB Current=390 A. BB Angle=54 Deg
Run 4646 Starting Hydrogen Elastic LH2 target Stop Run high Deadtime 80%
HV crashed Bad bean
Start again Run 4647 DT=21% okay Ended 9:50 1M Events
Production Running Kinematics B
Change HRS P = 986. Set Prescales
Change probe to B
Run 4647 calibration LH2 1M Events 4.0
Run 4648 Production LH2 1 M Events 4.0
Run 4649 Production LH2 1 M Events 4.0
Run 4650 Production LH2 1 M Events 4.0
Run 4651 Production LH2 1 M Events 4.5
Run 4652 Production LH2 1 M Events 4.5
Run 4653 Production LH2 1 M Events 5.0
Run 4654 Production LH2 1 M Events 4.5
Run 4651 Production LH2 1 M Events 4.5
Run 4655 Production LH2 1 M Events 4.5
Run 4656 Production LH2 1 M Events 4.5
Run 4657 Production LH2 1 M Events 4.5
Run 4658 Production LH2 1 M Events 4.5
A strong peak appeared in the coin spectrum in Run 4658..
It is not present in any other run. We will replay it.
The peak was still there.
Run 4659 Production LH2 1 M Events 4.5
Run 4660 Production LH2 1 M Events 4.5
Run 4661 Production LH2 1 M Events 4.5
Run 4662 Production LH2 1 M Events 4.5
Run 4663 Production LH2 1 M Events 4.5
Run 4664 Production LH2 1 M Events 4.5
Run 4665 Production LH2 1 M Events 4.5
Run 4666 Production LH2 1 M Events 4.5
Run 4667 Production LH2 1 M Events 4.5
Plan is to make a controlled access at 1630
to move BB to 48 deg and have JP fix the target cooling fan
Production running will continue at kinematics F after the change
4:00 PM
End Day shift