• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Armstrong

    Log entry time 18:39:31 on May 3,2008

    Entry number 236749

    keyword=Target status

    The target is back to nominal conditions, cool and copacetic.


    Loop 1 20.00 K, and PID regulating properly.
    Cell Pressure: 23.9 psi
    Fan speed: 29 Hz
    HighPower Heater: 40 W or so (no beam on target).
    15 K coolant flow: 10.3 g/s
    JT valve: 38%


    All alarms reset.

    Screen shots below.

    Meanwhile, we are taking Ta data at the new kinematics.


    FIGURE 1

    FIGURE 2