Log entry time 16:06:30 on May21,2008
Entry number 239108
keyword=Day Shift Summary
Shift workers: A. Sarty, B. Michaels, D. Protopopescu
Shift begins with production running: Kin2, delta=+2%
Unstable beam for first ~45 minutes of shift, then settles (somewhat).
----------------------------------------------------------
Summary of Runs for completing Kin2, delta=+2% (6 cm LH2 target):
Using current about 4 microamps.
Run 1408: 0.6 M events (running total = 45.5 M)
Run 1409: junk (beam never came)
Run 1410: 5 M events (running total = 50.5 M)
Run 1411: 5 M events (running total = 55.5 M)
Run 1412: 5 M events (running total = 60.5 M)
Run 1413: 5 M events (running total = 65.5 M) DONE.
11:45: Putting in Al Dummy target to complete Kin2, delta=+2%.
Run 1414: Al Dummy target @ 20 uA. Done @ 12:02.
------------------------------------------------------
Take Controlled Access to move BigBite angle.
Ready to START KIN3:
Run 1415: start @ 13:37 - First Run for Kin3, delta=-2%.
All BB shower blocks on. Determined which 9 BB blocks to
keep on (see associated halog entry).