    Day Shift Begins
    R.Lindgren SL
    B. Norum TO
    Elena Long 3rd
    Run 1510 in progress 58 M events accumulated.
    Run 1510 8:29 5M Total = 63M
    Run 1511 8:42 0.7M Total =63.7M

    8:42 Beam Off
    8:55 Beam On

    Run 1512 9:11 2M Total = 65.7M
    9:15 Change target to Aluminum dummy
    9:23 Target change complete, Start Run 1513
    9:40 Run 1513 stopped; target to H2 6cm
    9:50 Run 1514 started at delta = 0%
    10:00 Stop Run 1514 Calibration 0.73M
    10:02 Move target to Aluminum Dummy
    10:05 Run 1515 Aluminum Dummy 39K Events
    10:15 Move target to LH2
    10:20 Run 1516 Start production Running
    10:30 LH2 target
    Stop Run 1516 to turn on more shower blocks
    10:53 Start Run 1517 8 shower blocks on
    10:54 Stop Run 1517 Shower Counter HV Off?
    11:36 Run 1517 is okay.

    Delta = 0% Kinematics
    10:53 Run 1516 1.96 M Events Total = 1.96 M
    10:54 Run 1517 1.47 M Events Total = 3.43 M
    11:47 Run 1518 5 M Events Total = 8.43 M
    12:26 Run 1519 5 M Events Total = 13.43 M
    13:14 Run 1520 5 M Events Total = 18.43 M
    13:53 Run 1521 5 M Events Total = 23.43 M
    14:37 Run 1522 5 M Events Total = 28.43 M

    15:45 Run 1523 End of Run Failed 2.7 M Events
    15:45 Run 1524 Aborted
    16:05 Run 1525 Started okay

    End of Day Shift