Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels
Log entry time 12:36:16 on May29,2008
Entry number 240252
keyword=cavity tests, part I
Have added the following steering magnets to the EPICS logging:
MBC1C20H, MBC1C20V, MAT1H01H, MCZ1H04H, MCZ1H04V.
MBC* is upstream of chicane, MAT* is downstream, and MCZ is
just upstream of Moller. Default plan is to use MAT1H01H and
MCZ1H04V to see if we can get enough amplitude in position.
Runs
21028 -- pedestal run (see halog)
21029 -- autogain restored, no beam.
21030 -- 21035 -- mostly no beam, or pulsed beam. Checkout.
About to get 10 uA CW. Musson will adjust the gains and phases
to optimize the cavities. Then we wills steer the beam around
at 10 uA for checkout.
Run 21036, I = 9.4 uA, Musson is adjusting gains, etc.