    5/29/08 Swing shift
    John LeRose (SL)
    Jin Huang (TO)
    Werner Boeglin (3rd)

    Left Arm 0.8526 GeV, 47 deg.
    BigBite 45 deg. 700 Amps

    At start of shift HAPPEX beam studies underway.
    16:30 MCC says the beam is ours


    16:23 1702 Test Production 6cm LH2
    16:38 1703 Test Production 6cm LH2

    Prescales etc. adjusted ready for full production running

    16:45 1704 Production 6cm LH2 K7-D-2
    17:27 1705 Production 6cm LH2 K7-D-2 probably garbage
    17:41 ROC 10 failed. We reset it.
    17:48 1706 Production 6cm LH2 K7-D-2

    18:53 MCC has box supply problem estimate 20 minutes to recover

    It takes a lot longer than 20 minutes.

    22:15 Brad makes an access to adjest the BigBite Cerenkov gas
    flow see halog 240346

    22:42 1707 pedestal run (no beam)

    At shift end still no beam