User name M.Shabestari
Log entry time 00:03:15 on June 3,2008
Entry number 240848
keyword=Swing Shift Summary
Swing shift summary June 2, 2008
SL : Mitra Shabestari
TO : Chiranjib Dutta
3rd : Elena Long
Summary
========
Kinematics 8
BigBite = 50 degrees,
LHRS = 43.5 degrees, LHRS momentum = 0.8949 GeV/c
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
16:00 Shift started. Run# 1823 has already started.
Target: 6 cm LH2
Beam current: 21 uA
----------> Run# 1823 ; events = 5 M
16:34 ----> Run# 1824 ; events = 0.7 M
16:41 ----> Called MCC and asked them to adjust the beam position,since it was off
(BPMA: Y was 0.8 insted of 1.2 & BPMB: X was -2.3 instead of -1.8).
MCC informed us that they have software problem, and fixing the problem
would take about 30 minutes. No beam for a while. Stopped run 1824.
17:05 ----> Beam is back. BPMs look OK. We continue taking production data.
17:06 ----> Run# 1825 ; events = 5 M
17:53 ----> Run# 1826 ; events = 2.9 M
18:20 ----> HV tripped. I turned the HV back on. Stopped the run.Everything looks fine now.
We contiue taking data.
18:25 ----> Run# 1827 ; events = 5 M
19:11 ----> Run# 1828 ; events = 5 M
19:58 ----> Run# 1829 ; events = 5 M
20:56 ----> Run# 1830 ; events = 2.4 M
21:31 ----> HV tripped due to beam trip.We stopped the run. I turned the HV back on. .
21:34 ----> Run# 1831 ; events = 5 M
22:27 ----> Run# 1832 ; events = 3.3 M
23:01 ----> MCC called. They had RF trip. No beam for a while.
23:07 ----> Beam is back.
23:07 ----> Run# 1833 ; events = 5 M
23:56 ----> Run# 1834 ;
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Total # of events before Swing Shift = 32.3 M (Entry 240802)
Total # of events at the end of Swing Shift = 44.3 M
-----------------------------------------------------------
Total number of events for the current Kinematics = 76.6 M
-----------------------------------------------------------