Main INDEX
Monthly INDEX
PREV
NEXT
User name V. Sulkosky
Log entry time 08:07:31 on June 4,2008
Entry number 241002
keyword=Owl Shift Summary
June 4, 2008
SL/TO: V. Sulkosky
3rd: E. Piasetzky
Owl Shift Summary
========================================================================
00:00 Continue Kinematic 2 (0.3 GeV2) P0 = 0.5761 GeV/c, angle = 60 degs.
02:15 Move target to Al Dummy.
02:22 ROC5 problem. Reboot ROC5 and restart CODA.
02:43 Change LHRS momentum P0 = 0.5648 GeV/c (0% setting).
02:46 Move target to 6 cm LH2.
02:55 Preshower and Shower HVs all on. Ask for 4.5 uA to check blocks for
the next kinematic point.
03:20 Turn off all Preshower and Shower HV and only turn on blocks illuminated
by the elastic strip.
03:26 Begin Kinematic 2 (0.3 GeV^2) dp = 0% production.
05:27 MCC called beam off due to a problem with an ARC dipole.
05:40 Beam back.
06:42 Beam off due to another magnet problem.
07:02 Beam back.
07:11 Beam off again due to magnet problem.
07:38 Beam back.
Run Summary
========================================================================
Start Run Events Comments
========================================================================
23:53 1859 5.0M Production LH2
00:33 1860 5.0M Production LH2
01:12 1861 5.0M Production LH2
01:58 1862 2.0M Production LH2 (dp = -2%)
02:20 1863 XXXX junk ROC5 crash
02:25 1864 178k Al Dummy (dp = -2%)
02:58 1865 XXXX junk
03:00 1866 180k Test with BB pre/Shower HVs all on and only T1
03:11 1867 1.4M Check blocks with BB pre/Shower HVs all on
03:26 1868 5.0M Production LH2 (dp = 0%)
04:04 1869 5.0M Production LH2 (dp = 0%)
04:50 1870 3.9M Production LH2 (dp = 0%)
05:41 1871 5.0M Production LH2 (dp = 0%)
06:33 1872 848k Production LH2 (dp = 0%)
07:03 1873 1.1M Production LH2 (dp = 0%) stopped due to no beam.
07:38 1874 ?.?M Production LH2 (dp = 0%) continue to next shift.