June 5, 2008
SL: V. Sulkosky
TO: B. Hahn
3rd: B. Moffit
Owl Shift Summary
========================================================================
00:00 Begin shift finishing up pointing test,
00:07 Change Left HRS momentum to 0.5535 MeV/c and target to LH2 6 cm.
00:17 All BigBite preshower and shower HVs are on.
00:48 Begin Kinematic 2 (0.3 GeV2) P0 = 0.5535 GeV/c, angle = 60 degs.
04:21 MCC called beam will be off for about 10 minutes due to RF separator problems.
06:16 MCC called beam will be off, RF separator has been fixed, beam is gone to clean up orbits.
06:30 VDC HV trip. Reset HVs.
07:28 beam off due magnet problems related to a power hiccup.
Run Summary
========================================================================
Start Run Events Comments
========================================================================
00:00 1888 764k Point test run with raster
00:30 1889 2.0M Test to check shower blocks
00:48 1890 5.0M Production Run LH2 6 cm (dp = +2%)
01:29 1892 5.0M Production Run LH2 6 cm (dp = +2%)
02:08 1893 5.0M Production Run LH2 6 cm (dp = +2%)
02:55 1894 5.0M Production Run LH2 6 cm (dp = +2%)
03:33 1895 5.0M Production Run LH2 6 cm (dp = +2%)
04:10 1896 621k Production Run LH2 6 cm (dp = +2%)
04:38 1897 5.0M Production Run LH2 6 cm (dp = +2%) no beam for 10 mins.
05:35 1898 5.0M Production Run LH2 6 cm (dp = +2%)
06:14 1899 XXXX junk no beam LHRS VDC HV tripped at end of run
06:36 1900 5.0M Production Run LH2 6 cm (dp = +2%)
07:19 1901 703k Production Run LH2 6 cm (dp = +2%) no beam at end of run
07:47 1902 ???? Continue to next shift