• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 08:01:15 on June 5,2008

    Entry number 241111

    keyword=Owl Shift Summary

    June 5, 2008
    SL: V. Sulkosky
    TO: B. Hahn
    3rd: B. Moffit

    Owl Shift Summary
    ========================================================================
    00:00 Begin shift finishing up pointing test,
    00:07 Change Left HRS momentum to 0.5535 MeV/c and target to LH2 6 cm.
    00:17 All BigBite preshower and shower HVs are on.
    00:48 Begin Kinematic 2 (0.3 GeV2) P0 = 0.5535 GeV/c, angle = 60 degs.
    04:21 MCC called beam will be off for about 10 minutes due to RF separator problems.
    06:16 MCC called beam will be off, RF separator has been fixed, beam is gone to clean up orbits.
    06:30 VDC HV trip. Reset HVs.
    07:28 beam off due magnet problems related to a power hiccup.

    Run Summary
    ========================================================================

    Start Run Events Comments
    ========================================================================
    00:00 1888 764k Point test run with raster

    00:30 1889 2.0M Test to check shower blocks
    00:48 1890 5.0M Production Run LH2 6 cm (dp = +2%)
    01:29 1892 5.0M Production Run LH2 6 cm (dp = +2%)
    02:08 1893 5.0M Production Run LH2 6 cm (dp = +2%)
    02:55 1894 5.0M Production Run LH2 6 cm (dp = +2%)
    03:33 1895 5.0M Production Run LH2 6 cm (dp = +2%)
    04:10 1896 621k Production Run LH2 6 cm (dp = +2%)
    04:38 1897 5.0M Production Run LH2 6 cm (dp = +2%) no beam for 10 mins.
    05:35 1898 5.0M Production Run LH2 6 cm (dp = +2%)
    06:14 1899 XXXX junk no beam LHRS VDC HV tripped at end of run
    06:36 1900 5.0M Production Run LH2 6 cm (dp = +2%)
    07:19 1901 703k Production Run LH2 6 cm (dp = +2%) no beam at end of run
    07:47 1902 ???? Continue to next shift