    User name V. Sulkosky

    Log entry time 08:02:09 on June 6,2008

    Entry number 241246

    keyword=Owl Shift Summary

    June 6, 2008
    SL: V. Sulkosky
    TO: B. Moffit
    3rd: X. Qian

    Owl Shift Summary
    ===============================================================================
    00:00 Begin shift at Kinematic 1, (dp = -2%) LHRS P0 = 0.6286 GeV/c, 57.5 degs.
    00:20 BB HV tripped. Reset by cycling power off and on.
    01:18 Move target to Al Dummy.
    01:41 Move to LH2 6 cm target.
    01:48 All BB preshower and shower HVs on.
    02:10 Turn off all BB shower HVs and turn on selected blocks. Begin K1 D0%.
    05:17 Loop 3 fan began to fluctuate was at 60 Hz now mean is 25 Hz +/- 10 Hz.
    07:25 Move target to Al dummy.
    07:49 Move target to Loop 3 LH2 6 cm.

    Run Summary
    ================================================================================

    Start Run Events Comments
    ================================================================================
    23:41 1924 3.7M Production run LH2 (dp = -2%) BB HV trip at end
    00:22 1925 5.0M Production run LH2 (dp = -2%)
    01:02 1926 2.0M Production run LH2 (dp = -2%)
    01:23 1927 196k Al Dummy (dp = -2%)

    01:50 1928 2.4M Test for shower blocks all HVs on.
    02:11 1929 5.0M Production run LH2 (dp = 0%)
    02:55 1930 5.0M Production run LH2 (dp = 0%)
    03:34 1931 5.0M Production run LH2 (dp = 0%)
    04:13 1932 5.0M Production run LH2 (dp = 0%)
    04:50 1933 5.0M Production run LH2 (dp = 0%)
    05:28 1934 5.0M Production run LH2 (dp = 0%) fan freq. fluctuating
    06:10 1935 5.0M Production run LH2 (dp = 0%) fan freq. fluctuating
    06:48 1936 5.0M Production run LH2 (dp = 0%) fan freq. fluctuating
    07:30 1937 192k Al Dummy (dp = 0%)
    07:55 1938 ???? Continue into next shift fan freq. fluctuating