• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 08:00:08 on June 7,2008

    Entry number 241438

    keyword=Owl Shift Summary

    Owl Shift Summary
    ===============================================================================
    00:00 Begin shift at Kinematic 2, (dp = -2%) LHRS P0 = 0.5761 GeV/c, 60.0 degs.
    02:44 Move target to Al dummy.
    03:04 Move target to LH2 6 cm.
    03:05 Change LHRS P0 to 0.5648 GeV/c.
    03:10 BigBite preshower and shower HV
    03:23 Begin Kinematic 2, (dp = 0%), LHRS P0 = 0.5648 GeV/c, 60 degs.

    Smooth data taking for the rest of the shift.

    Run Summary
    ================================================================================

    Start Run Events Comments
    ================================================================================
    23:27 1986 5.0M Production run LH2 (dp = -2%)
    00:05 1987 5.0M Production run LH2 (dp = -2%)
    00:45 1988 5.0M Production run LH2 (dp = -2%)
    01:27 1989 5.0M Production run LH2 (dp = -2%)
    02:07 1990 5.0M Production run LH2 (dp = -2%)
    02:48 1991 149k Al Dummy run

    03:12 1992 484k Run to check BB shower blocks
    03:23 1993 5.0M Production run LH2 (dp = 0%)
    04:02 1994 5.0M Production run LH2 (dp = 0%)
    04:42 1995 5.0M Production run LH2 (dp = 0%)
    05:22 1996 5.0M Production run LH2 (dp = 0%)
    06:01 1997 5.0M Production run LH2 (dp = 0%)
    06:44 1998 ?.0M Production run LH2 (dp = 0%)
    07:28 1999 ???? Continue into next shift