June 9, 2008
SL: V. Sulkosky
TO: P. Decowski
Swing Shift Summary
===============================================================================
16:00 Begin shift at Kinematic 3, (dp = 2%) LHRS P0 = 0.6955 GeV/c, 53.0 degs.
20:01 Turn beam over to Transversity for detector tests.
21:40 Transversity tests completed.
21:43 Move to Carbon with Hole for short Bull's eye scan.
21:45 Ready for Bull's eye scan.
22:02 Beam off for summer shut down.
22:03 Ramp LHRS momentum to 0.0 and BigBite current to zero.
22:05 Dave Meekins takes control of the cryotarget.
Run Summary
================================================================================
Start Run Events Comments
===============================================================================
15:31 2084 5.0M Production run LH2 (dp = 2%)
16:11 2085 5.0M Production run LH2 (dp = 2%)
16:55 2086 5.0M Production run LH2 (dp = 2%)
17:38 2087 5.0M Production run LH2 (dp = 2%)
18:21 2088 5.0M Production run LH2 (dp = 2%)
19:03 2089 5.0M Production run LH2 (dp = 2%)
19:46 2090 1.5M Production run LH2 (dp = 2%)
Runs 2091 to 2109 are detector tests runs for Transversity.
Runs 2110 to 2112 are for the Bull's eye scan.
2110 nominal E08-007 beam positions BPMA (-1.1,1.2) and BPMB (-1.8,1.9)
2111 BPMA and BPMB at (0,0).
2112 BPMA and BPMB at (2,-2).