• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 22:25:14 on June 9,2008

    Entry number 241842

    keyword=Swing Shift Summary

    June 9, 2008
    SL: V. Sulkosky
    TO: P. Decowski

    Swing Shift Summary
    ===============================================================================
    16:00 Begin shift at Kinematic 3, (dp = 2%) LHRS P0 = 0.6955 GeV/c, 53.0 degs.
    20:01 Turn beam over to Transversity for detector tests.
    21:40 Transversity tests completed.
    21:43 Move to Carbon with Hole for short Bull's eye scan.
    21:45 Ready for Bull's eye scan.
    22:02 Beam off for summer shut down.
    22:03 Ramp LHRS momentum to 0.0 and BigBite current to zero.
    22:05 Dave Meekins takes control of the cryotarget.

    Run Summary
    ================================================================================

    Start Run Events Comments
    ===============================================================================
    15:31 2084 5.0M Production run LH2 (dp = 2%)
    16:11 2085 5.0M Production run LH2 (dp = 2%)
    16:55 2086 5.0M Production run LH2 (dp = 2%)
    17:38 2087 5.0M Production run LH2 (dp = 2%)
    18:21 2088 5.0M Production run LH2 (dp = 2%)
    19:03 2089 5.0M Production run LH2 (dp = 2%)
    19:46 2090 1.5M Production run LH2 (dp = 2%)

    Runs 2091 to 2109 are detector tests runs for Transversity.

    Runs 2110 to 2112 are for the Bull's eye scan.

    2110 nominal E08-007 beam positions BPMA (-1.1,1.2) and BPMB (-1.8,1.9)
    2111 BPMA and BPMB at (0,0).
    2112 BPMA and BPMB at (2,-2).