Jefferson Lab HALL A Logbook for August 08 - All EXCEPT Automatic Entries
Main INDEX
Saturday
Friday
242731 08/29/08 14:05 adev BigBite WireChamber Threshold change!
242730 08/29/08 14:02 Yi Qiang Target computer down/spin signal outage
Thursday
0 08/28/08 19:25 no_name no_key
242710 08/28/08 19:18 atrig Trigger-Download
242682 08/28/08 15:35 Chiranjib 75 meter long fiber check
Wednesday
242666 08/27/08 22:07 adev BigBite WireChamber Measured Voltage change!
242665 08/27/08 21:56 adev BigBite WireChamber Measured Voltage change!
242660 08/27/08 18:39 adev BigBite WireChamber Measured Voltage change!
242657 08/27/08 18:34 adev BigBite WireChamber Measured Voltage change!
242656 08/27/08 18:31 adev BigBite WireChamber Measured Voltage change!
242655 08/27/08 18:28 adev BigBite WireChamber Measured Voltage change!
242652 08/27/08 18:24 adev BigBite WireChamber Chamber Turn on/off!
242644 08/27/08 17:49 adev BigBite WireChamber HVGUI Start!
242643 08/27/08 17:46 adev BigBite WireChamber HVGUI Start!
242642 08/27/08 17:42 adev BigBite WireChamber HVGUI Start!
242641 08/27/08 17:27 V. Sulkosky Switched A1 TDC Cable for Left PMTs
242638 08/27/08 16:28 V. Sulkosky S1 TDC Problem Fixed(?)
242637 08/27/08 09:24 V. Sulkosky No TDC signal for S1
Tuesday
242631 08/26/08 19:25 atrig Trigger-Download
242630 08/26/08 19:11 atrig Trigger-Download
242618 08/26/08 11:49 atrig Trigger-Download
242617 08/26/08 11:48 atrig Trigger-Download
Monday
242582 08/25/08 22:45 adev BigBite WireChamber Measured Voltage change!
242577 08/25/08 20:19 adev BigBite WireChamber Measured Voltage change!
242574 08/25/08 20:09 adev BigBite WireChamber Measured Voltage change!
242573 08/25/08 19:58 adev BigBite WireChamber Measured Voltage change!
242538 08/25/08 17:09 Jin Huang Simulated Target Spin Signal Update
242535 08/25/08 16:55 R. Michaels filesplitting to 4 GB working
242526 08/25/08 16:13 R. Michaels fixed R-HRS fastbus
242491 08/25/08 13:46 fansler Q1 N2 0-10V
242486 08/25/08 11:42 adev BigBite WireChamber Measured Voltage change!
242484 08/25/08 11:32 adev BigBite WireChamber Measured Voltage change!
242483 08/25/08 10:12 atrig Trigger-Download
242482 08/25/08 10:10 R. Michaels trig download code (trigsetup) recompiled
Sunday
242478 08/24/08 21:30 adev BigBite WireChamber Measured Voltage change!
Friday
242454 08/22/08 20:06 Jin Huang Simulated Target Spin Signal Ready
242435 08/22/08 16:56 adev BigBite WireChamber Measured Voltage change!
242409 08/22/08 14:01 adev BigBite WireChamber Measured Voltage change!
242408 08/22/08 13:51 adev BigBite WireChamber Measured Voltage change!
242405 08/22/08 11:47 V. Sulkosky Pion Rejector HV Settings
242404 08/22/08 11:38 V. Sulkosky Pedestals and Widths for S1 and S2m
242403 08/22/08 11:33 V. Sulkosky Pedestals and Widths for S1 and S2m
Thursday
242400 08/21/08 23:17 V. Sulkosky Pion Rejector HV Turned On and Adjusted
242399 08/21/08 23:17 V. Sulkosky Runs 1158 with Pedestal Suppression Off
242398 08/21/08 23:12 V. Sulkosky Pion Rejector HV Turned On and Adjusted
242360 08/21/08 09:41 V. Sulkosky Pedestals Updated for S1, S2m and A1
242359 08/21/08 09:39 V. Sulkosky Light leak fixed
Wednesday
242310 08/20/08 22:12 adev BigBite WireChamber Threshold change!
242294 08/20/08 20:46 adev BigBite WireChamber Threshold change!
242285 08/20/08 19:44 adev BigBite WireChamber Measured Voltage change!
242284 08/20/08 19:34 adev BigBite WireChamber Chamber Turn on/off!
242253 08/20/08 01:49 adev BigBite WireChamber Measured Voltage change!
242245 08/20/08 01:18 adev BigBite WireChamber HVGUI Start!
Tuesday
242230 08/19/08 23:33 adev BigBite WireChamber Threshold change!
242226 08/19/08 23:12 adev BigBite WireChamber HVGUI Start!
242225 08/19/08 23:10 V. Sulkosky Runs 1076-1078 run with Pedestal Suppression Off
242221 08/19/08 22:55 V. Sulkosky S2m Delay for TDCs Lengthened and ADC Channels Swapped
242216 08/19/08 22:33 adev BigBite WireChamber HVGUI Start!
242212 08/19/08 21:34 adev BigBite WireChamber HVGUI Start!
242210 08/19/08 21:24 V. Sulkosky Correction rate with lights off about 70 Hz
242209 08/19/08 21:23 V. Sulkosky Light Leak for S2m L6 PMT
242208 08/19/08 21:17 V. Sulkosky LHRS S2m Scaler Rates
242168 08/19/08 15:22 adev BigBite WireChamber HVGUI Start!
Monday
242142 08/18/08 17:53 V. Sulkosky Left HRS DAQ Status: Functional
242125 08/18/08 10:09 Jack (techs) Left Arm Slow Controls UPS
Sunday
Saturday
Friday
242103 08/15/08 10:52 adev BigBite WireChamber HVGUI Start!
Thursday
242102 08/14/08 23:37 adev BigBite WireChamber HVGUI Start!
242100 08/14/08 23:20 adaq HVGUI Start!
0 08/14/08 22:47 no_name no_key
Wednesday
242068 08/13/08 20:30 R. Michaels Experiment switchover for DAQ
Tuesday
242061 08/12/08 21:15 atrig Trigger-Download
242058 08/12/08 18:17 atrig Trigger-Download
242051 08/12/08 12:18 jinhuang Target Reports are Automatic Imported to HaLog
242049 08/12/08 11:50 adaq target: Spin Flip Report: Test Report to Halog scripts
242045 08/12/08 11:37 Bob / Xin network fixed (faster)
242043 08/12/08 11:04 V. Sulkosky S2m and A1 ready for Cosmic Checkout
242042 08/12/08 11:01 R. Michaels ROC9,10 deadtime high
242040 08/12/08 10:51 V. Sulkosky A1 Aerogel HV Map
242028 08/12/08 10:23 V. Sulkosky S2m HV Map
242026 08/12/08 10:09 V. Sulkosky Left HRS HV Settings
242023 08/12/08 09:54 V. Sulkosky S2m and A1 HV Problems Addressed
242022 08/12/08 01:26 adaq target: Spin Flip Report: ~900 Flips OK
Monday
242020 08/11/08 23:58 adaq target: Spin Flip Report: 1000 + Flip OK. Test Finished
241996 08/11/08 22:36 adaq target: Spin Flip Report: Testing Flip Every 5s Since Count #~1200
241985 08/11/08 14:24 Yi Qiang Target Holding Field Mapping is done
241984 08/11/08 09:19 gunning Trigger Supervisor
Friday
241983 08/08/08 18:10 jinhuang Target Coil Power Change
241980 08/08/08 15:50 Yi Qiang BigBite Magnet Ready
Thursday
241973 08/07/08 10:57 jpchen Target coils powered up for field mapping
241972 08/07/08 10:32 Yi Qiang Horizontal holding field coils are powered up
Monday
241971 08/04/08 16:53 A. Camsonne Borrowed CGA580 regulator from gas shed for RICH