    I connected the scaler gates (helicity and target spin) from the LeCroy 4616 (ECL-NIM converter) that Kalyan installed yesterday to the first channel of the I/O of the scaler modules in the LHRS trigger supervisor. Here is the gate map to scaler module:
    4616 Channel        TS Slot           Description
    =========================================================
    1  (ECL - gray)        2         hel+, tar+ gate (normpp)
    2  (ECL - red)         3         hel+, tar- gate (normpm)  
    3  (ECL - purple)      4         hel-, tar+ gate (normmp)
    4  (NIM)               5         hel-, tar- gate (normmm)
    
    The three ECL cables are very close in length and are about 2" longer than the NIM cable. I checked to see if the gates were working as expected. First I couldn't see anything from the 4616, then I discovered that gray ribbon cable was inverted. The red cable was in channel 16 not 1. While running the DAQ, I was able to verify both by the LEDs on the scaler modules and the xscaler display that the gates were working properly for the modules in slots 2, 3 and 5. The module in slot 4 appears to be ignoring the gate signal, i.e. the scaler is always counting. I checked the cable and signal from channel 3 in the LeCroy 4616. The signal is good and will gate any of the other scaler modules. I then used the gate from channel 2 to test the module, but this module still refused to respond to the gate. We will need to check this module to find the cause of this problem.