User name V. Sulkosky
Log entry time 19:41:25 on October 10, 2008
Entry number 243642
Followups:
keyword=Left HRS Gas Cerenkov Recabled
The HV and signal cables for the left HRS gas Cerenkov have been
reconnected. I noticed that the foam around PMT # 8 on the left side
of the detector was coming away from the PMT mount. The base for this
PMT was also loose. All the other PMTs appear to be fine.
The detector stack is now in the detector hut. However the A/C unit will
be replaced on Monday and there is a chance the stack might have to come
back out. By the end of Monday, we should be able to reconnect the HRS
DAQ to the BigBite DAQ to resume cosmic checkout of the HRS and setup
the coincidence time with BigBite.
A copy of this log entry has been emailed to: bogdanw@jlab.org,ycwang@jlab.org