Beam tune should occur during Swing and Owl shift. Target operator is required for each of these shifts.
We are expecting to require a full shift starting Saturday DAY. All shifts until then are on STANDBY (please be close to site, as you may be called in).
A copy of this log entry has been emailed to: kalyan@jlab.org, yqiang@jlab.org, vasulk@jlab.org, camsonne@jlab.org, rom@jlab.org, xiaodong@jlab.org, brads@jlab.org