User name Lindgren
Log entry time 16:17:07 on October26,2008
Entry number 244743
keyword=Day Shift Summary
Day Shift
Richard Lindgren SL
Yi Zhang TO
Lamina El Fassi 3rd
8:00 No Beam
8:25 Run 2186 Empty BPM Calibration Coda crashed
8:30 Run 2187 Start again, Lost Beam
8:34 MCC lost beam due to magnet problem - calling in Expert
12:00 Hall A changed to control access.
13:00 Changed back to beam permit.
14:10 Waiting for Beam. Expected soon.
Start Run 2188 14:48 End 14:54
Bryan looked at BPM and noticed that 5 out of 8 wires still saturating ADC
Call Vince to go in the hall to investigate BPMs
15:30 Hall A in Control Access
Survey underway by MCC - Amy
People in Hall
Vince S.
Yi Zhang
Quick Summary
We lost beam 8:30 due to a magnet problem in arc, Beam returned at about 15:00. We discovered that 5/8 wires in BPM's still saturating. Enter hall to repair at 15:30.
Day Shift Ends