    User name Kalyan

    Log entry time 14:49:30 on October 28, 2008

    Entry number 245155

    This entry is a followup to: 245004

    Followups:

    keyword=scaler checks update

    From the log entry 244999 and 245004, T6++ and T2-+ are the only scaler
    channels that were not consistent between L_HRS and BiBite. 
    

    The way it was set up is, the ribbon cable connected to the four gated scalers(chan 1-16) on L-HRS have five connectors on it. The last connector is left empty. Today I unplugged the cable and connected it back so that the first connector is empty and next four carry the signals to the scalers. By doing this I made sure it is same as the other ribbon cable(chan 17-32) on the scalers. Strangely, I noticed that problem with T6++ went away, but we still have one problem chan, T2-+. (run 2352)

    I am not sure what else I can try to get the last one right.