• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Gao

    Log entry time 23:47:22 on October 29, 2008

    Entry number 245445

    keyword=Swing Shift Summary

    The shift started with a controlled access for some quick detector, target work. Went to beam permit just before 4:30 pm.

    4:30 moved to reference cell position. Beam position scan to find the optimized beam position: BPMA (-2.0, 0.3), BPMB (-2.5, 0.0), completed at 8:30 pm.

    Around 8:30 pm, CODA crashed after a different trigger configuration (leftarmrich) was downloaded. Brad tried to reboot without success.

    Xin Qian completed the MWDC dark current study around 9:15 pm. Called MCC for a controlled access for target work, and others including rebooting some of the ROCs in the hall.