    User name Nilanga

    Log entry time 17:30:14 on October30,2008

    Entry number 245606

    keyword=Shift Summary

    Continue Reference cell pressure curve runs

    Run 2516 - Junk run - cell may have contained some 3He
    Run 2517 - 515 Torr
    Run 2518-2520 Junk Runs - deadtime too high etc


    It looks like for the previous runs the deadtime has been very high; and also there is the questions about the correleation of the two pressure gauges: the vacuum guage in torr and pressure gauge in psig.

    So we will re-take the N2 runs quickly:

    Run 2521 - approx 950 torr - 24.5 psig
    Run 2522 - ~ 765 torr - 14 psig
    Run 2523 - 511 torr - -5.0 psig
    Run 2524 - 246 torr - -10 psig

    10.15 - MCC is running Fast-BB diagnostics; asked for access
    11.15 - Finally we have the access; sieve installed
    11.45 - techs out of the hall, sieve in place, ask for beam
    12.00 - Waiting for beam - set for delta scan 4% setting
    12.30 - have beam now, but waiting for MCC to change the beam position to the value we need; take a test run in the meantime.

    Delta Scan with the sieve

    2526 - 4%, beam positions are not good.
    2527 - 4%, beam centered on BeO; un-rastered.
    2528 - 4%, beam centered on BeO; 1 x 1 rastered beam
    2529 - 2%
    2530 - 0%
    2531 - 0%
    2532 - -2%
    2533 - -4%
    2534 - -4%