Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Gilman
Log entry time 18:50:47 on November 02, 2008
Entry number 246287
This entry is a followup to: 246278
keyword=shift plan followup 2
JP asks us to pump the target polarization back up during the Moller
measurement, then continue running longitudinal polarization after
until the 8 hours (plan #6 and #10 on board) are up or the target
polarization drops to 25%. The longitudinal setting was split in 2 since
we cannot pump while longitudinal, to keep the polarization high.
So it is okay if we do more than half now, since the Moller gives
us time to pump back up.