• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Gilman

    Log entry time 18:50:47 on November 02, 2008

    Entry number 246287

    This entry is a followup to: 246278

    keyword=shift plan followup 2

    JP asks us to pump the target polarization back up during the Moller measurement, then continue running longitudinal polarization after until the 8 hours (plan #6 and #10 on board) are up or the target polarization drops to 25%. The longitudinal setting was split in 2 since we cannot pump while longitudinal, to keep the polarization high. So it is okay if we do more than half now, since the Moller gives us time to pump back up.