NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 08:05:14 on November 04, 2008
Entry number 246600
This entry is a followup to: 246584
Followups:
keyword=Successful Manual Spin Flip (Pol. = 50%)
A Manual Spin flip Trans+ -> Trans- is carried out successfully.
Meantime, we gathered enough information to setup spin flip system @
Transverse Pumping.
-------------------------
Time Line
-------------------------
1. Stop Beam
2. NMR Measurement (52%)
https://www.jlab.org/~bbsoftw/TargetReports/GenericLog/NMRField_04-
11_07-23-21.html
3. Stop Pumping Laser
4. Q-Wave Plate for transverse line Rotate to "Spin Down"
5. NMR Frequency sweep
https://www.jlab.org/~bbsoftw/TargetReports/GenericLog/ScreenShotNMR_Fre
quencySweep_v5.vi_04-11_07-53-11.html
6. Manual AFP Spin FLip
https://www.jlab.org/~bbsoftw/TargetReports/GenericLog/ScreenShotNMR_He_
Sweep_v2.vi_04-11_07-56-48.html
7. Laser On
8. NMR Measurement (50%)
https://www.jlab.org/~bbsoftw/TargetReports/GenericLog/NMRField_04-
11_07-36-31.html
9. Call For Beam
-------------------------
Conclusion
-------------------------
1. Spin is 50% at starting of Trans - Delta run # 2788
2. Phase Setting for Spin flip on Transverse line is confirmed to be
correct.
3. NMR Signal on Vertical Coil has better quality than that on Trans
Pick Up coil. We will be able to use it on hardware signal.
A copy of this log entry has been emailed to: yqiang, brads