User name E. Schulte
Log entry time 15:58:27 on November 05, 2008
Entry number 246925
keyword=Day Shift Summary, November 5, 2008
08:00 Shift starts taking data on the reference cell with hydrogen
pressurized to 110 psi. There exists some confusion about the plan for
the next hour or so. But, we're trying to sort it out.
08:30 We got it all straightened out. We're going to run in the current
configuration (reference cell with hydrogen, BigBite Sieve in, target
collimator out) until further notice. At the time of further notice
(which will conveniently coincide with a beam down period) we will make
the access to remove the BigBite sieve, and put in the target collimator.
09:00 Doug calls for Brad, something about the beam...Need to make sure
Brad calls him back.
09:06 Vince & Kalyan need to do some runs to locate the coincidence time.
09:38 MCC called to find out if we had the dummy target in. I told them
it's the reference cell.
10:00 MCC called to let us know that they have an IOC issue and will be
down for an undetermined amount of time. Called for a Controlled Access.
10:05 MCC is also going to do a Wien angle change. And the target
polarization is 40%!!!
10:46 Put Reference Cell Control Panel in Local Mode.
11:22 Collimators are an and Yi is going to unlock the lasers.
11:46 Reference Cell Control Panel now back in Remote Mode. The
regulator has been replaced so we can go to 135 psi on the reference cell
with hydrogen. The current pressure is 100 psi.
11:49 RC lets us know that MCC is still having issues with an IOC, so
we're still on "their time"!
12:25 Called MCC to see what's up. They're still working on their IOC
and will call us when they're done.
12:35 MCC ready to send RF to hall. Request Beam Permit.
12:52 Request tune beam (2uA) from MCC to check the positions.
13:00 Requested change of target to Optics (BeO).
13:03 Requested 2uA of tune back to check spot on BeO target.
13:23 Request a harp scan from MCC. Changed target to "empty" position.
13:33 Harp scan complete. Harp B scan looks pretty crummy. D. Gaskell
kindly logged them.
13:39 Requested 5uA with MCC 4x4 raster. Check with spot++. Then the
beam got really unstable.
13:54 Change to optics target.
13:55 Optics target run with raster of, 5uA. Target collimator in, Sieve
in. The beam has been quite unstable.
14:10 Request 4x4 raster from MCC.
14:12 Begin filling reference cell with hydrogen to 135 psi. Started at
100 psi. The fill was successful.
14:26 Start raster scan. Reference cell, hydrogen 135 psi
Hall A raster values & T1 Rates
2x2 2 kHz
3x3 2 kHz
4x4 2 kHz
5x5 2 kHz
14:33 Request 4x4 raster, 5uA on reference cell with 135 psi hydrogen.
We will run for 2 hours beam-on-target.
14:38 CODA seems to have died. We'll try rebooting it. ROC's 8 & 9,
which died.
14:47 ROC's recovered, restarted taking data.
14:53 Gas Shed Airflow Alarm (cleared itself)
15:15 Merrily taking data. Beam's been a little better the last half
hour or so.
13:57 Shift ends taking data on reference cell, with hydrogen 135 psi.
We have about an hour or so of beam on target.