Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Ibrahim
Log entry time 00:01:30 on November 6,2008
Entry number 247031
keyword=Swing Shift Summary
Swing Shift Summary
16:00 Shift started taking data on the reference cell (H2 at 135 psig).
16:30 The RC took over to do a beam position check
17:40 Back to the reference cell (H2 at 135 psig).
18:20 The RC asked for controlled access.
19:05 Back from controlled access
19:05 Moved the target to empty and asked for tune beam. The MCC need 15min to do this.
19:25 Moved the target to the optics position
19:38 MCC are giving hall B tune beam and they cannot deliver CW beam to hall A for now.
19:50 Beam is back (CW, 5uA, raster off)
20:00 Noticed that BPMB is off. Called the MCC to set it.
20:15 MCC still having difficulty setting the beam position within 0.2mm of what is requested,
20:35 Asked MCC to do a harp scan.
21:30 Moved to the Reference Cell (H2 at 135 psig). Will stay here for the next 2 hours (30 min runs).
00:00 Shift ends while taking coincedence runs on H2. An additional 30min run should be taken by the owl shift.