Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Ibrahim
Log entry time 00:09:38 on November 7,2008
Entry number 247190
keyword=Swing Shift Summary
Swing Shift Summary
16:00 Shift started while the hall in restricted access.
17:00 The Left Dipole polarity was changed to Negative by hall A tech.
17:40 The Left arm quads polarity was changed to Negative by the RC.
17:45 MCC are doing the hall sweep.
17:50 Left arm momentum is set to 2.4 GeV/c.
18:40 Hall in controlled access.
19:35 Moved the target to the Empty position
19:40 Hall to power permit.
20:40 Tune beam to the hall.
20:58 MCC still need few more minutes to check something wrong with the beam.
10:00 The Hall_A HV alarm goes off every 1 or minutes and clears itself right away. I asked Alexander about this and he said it is probably not serious fluctuations.
11:00 A new set of beam positions are in place:
For He3 Cell: BPMA = (1,1) and BPMB = (-1,1)
For all other targets: BPMA = (1,4) and BPMB = (-1,4)
11:10 The MCC are still having problems with the beam.
00:00 Shift ends while we are still for the beam.
******************************************