    User name Jin Huang

    Log entry time 08:30:51 on November 12, 2008

    Entry number 248376

    This entry is a followup to: 248366

    keyword=Target Activity Before Production Running

    Target is now set to auto flip /20min @ Pol=~58%. Taking production 
    data.
    
    Time line before taking data:
    23:03  2 x Comet Laser Spectrum 2xFAP Spin up start at ~23%
    23:09  NMR Field Sweep @ EMPTY -> Pol = 23%
    Short After, Bigbite Magnet ramp up to 710A
    23:59  NMR Field Sweep @ EMPTY -> Pol = 20(1)%
    00:39  NMR Field Sweep @ EMPTY -> Pol = 30(1)%
    04:47  NMR Field Sweep @ Ref Cell -> Pol = 48%
    07:45  NMR Field Sweep @ He3 -> Pol = ~60%
    07:51  NMR Freq Sweep confirm Peak @ 80.8kHz, Phase is correct, Spin 
    Direction is correct
    07:55  It costs two Spin Flip to find out a error in calibration 
    constant. It's corrected.
    07:59  Spin Flip Subsystem Starts. 
    08:00  First Spin Flip -> Pol. = ~ 57%
    


    A copy of this log entry has been emailed to: yqiang, jpchen, camsonne