    keyword=Compton Commissioning

    Compton chicane beam tune has been successfuly completed.

    Difficulties were encountered in threading the beam through the newly installed e-detector chamber and beam pipes. The beam was scraping near the e-detector and causing ep-ion chamber trips.

    The orbit of the beam near the e-detector had to be raised by 1.5 mm from before for clear passage of the beam.