    User name D. Dutta

    Log entry time 00:01:34 on November17,2008

    Entry number 249290

    keyword=Shift Summary

    Swing Shift Summary
    D. Dutta, A. Narayan and D. Parno

    Begin shift with beam tuning in progress.
    Once the beam is at the correct position the He-3 target is moved into position, raster is turned on to 3x4 in MCC units and begin data
    taking with 12 uA current.
    4:15 start run #3566/30413
    4:44 start run 3567
    5:20 Beam off because of magnet trip, stop run.
    6:50 Beam back start run 3568
    7:30 start run 3569
    8:10 Start run 3570
    8:44 start run 3571
    9:25 start run 3572/30414
    10:00 stop run, start target tests
    10:05 start run 3573
    10:45 start run 3574
    11:20 start run 3575
    00:02 start run 3576

    List of runs
    3566 - 1.0M
    3567 - 0.9M
    3568 - 1.0M
    3569 - 1.0M
    3570 - 1.0M
    3571 - 1.0M
    3572 - 1.0M
    3573 - 1.0M
    3574 - 1.0M
    3575 - 1.0M