Figure 2: Lead (blue) and ??? (grey, not Pb) blocks roughly centered at bealine height. They are as far forward as possible, front edge is a few inches back from the front edge of the BB platform. (Added Nov. 11)
Figure 3, 4: Lead bags shielding from beamline closer to target. The
upstream bag has a neighbor on the other side of the black 'wing' on BB,
doubling the thickness to ~4" total. The downstream bag is by itself.
(Added Nov. 13)
Figure 1
Figure 2
Figure 3
Figure 4