• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Saha

    Log entry time 15:59:58 on November18,2008

    Entry number 249566

    keyword=Shift Summary

    Shift Summary

    0800: Run 3623 running, BB Cerenkov

    Tuning 2 uA cw beam with BeO target.
    Rates checked with new target position.
    Target auto spin flip started (p=71%)

    Run 3629: Pedestal run taken
    Run 3630: Short Production

    1050: MCC tune the beam for orbit
    1056: Beam is back, continue production

    1112: Run 3631 280k events
    1215: Run 3632 1M events
    1322: Run 3633 1M events
    1345: Run 3634 250k events (possible target reading error)
    1503: Run 3636 1M events

    Run 3637 still running