16:35 AFP Loss test with laser ON. sequence 248, count 9-18 (65.7%-62.8%)/(65.9%-63.2%) -> 0.54%
http://www.jlab.org/~adaq/halog/html/0811_archive/081118170255.html
16:45 EPR test for anti-parallel pumping without correction coil
http://www.jlab.org/~adaq/halog/html/0811_archive/081118170618.html
16:15 EPR test for parallel pumping without correction coil
http://www.jlab.org/~adaq/halog/html/0811_archive/081118172233.html
15:32 EPR test for parallel pumping with correction coil (small = 0.18A)
http://www.jlab.org/~adaq/halog/html/0811_archive/081118173619.html
15:45 EPR test for anti-parallel pumping with correction coil (small = 0.18A)
http://www.jlab.org/~adaq/halog/html/0811_archive/081118175528.html
18:01 Rotate field to Vertical
19:00 Finished setup of vertical pumping, did first EPR Calibration
http://www.jlab.org/~adaq/halog/html/0811_archive/081118190654.html
19:05 Auto spin flip ready to go
http://www.jlab.org/~adaq/halog/html/0811_archive/081118191004.html
A copy of this log entry has been emailed to: jpchen@jlab.org, gen@jlab.org