Left spectrometer vacuum gauge increases from 8 to 9 as we start shift.
Run 3662 in progress at start of shift.
run start stop events comments
3662 ---- 8:49 1 M
3663 8:50 9:10 0.3 M stop run to reset hrsl vacuum pump
9:10 ask for controlled access
9:41 access over, ask for beam back
9:52 MCC calls and says they are sending beam back
3664 9:51 10:41 0.2 M beam mostly off during this run
10:01: ioc issue, expect 10-15 minutes off...
11:43: beam returns!
3665 11:43 12:54 1 M ok, beam ratty, many long trips
3666 12:55 13:43 1 M ok, ~11 beam trips in last hour
3667 13:44 14:38 1 M ok. ~18 beam trips
3668 14:38 15:25 1 M ok. ~10 trips, one 3-4 minutes long
3669 15:26 ~15:50 435 k stopped when Q1 left trips.