• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Chiranjib

    Log entry time 23:08:53 on November 24, 2008

    Entry number 250614

    This entry is a followup to: 250217

    keyword=VDC TO calibration for the second period of Production

    Following Vince's suggestions and classification of the production run period triggered by the drift of the T0 of the LHRS VDCs , the calibration for the second period of the production data has been done. This period stretches from 12 th Nov to 13 th Nov. The coefficients are determined and the database file db_L.vdc.dat is updated in the DIRECTORY 20081113.

    The following figures show the time for each plane in ns ( horizontal axes) .As obvious from the plots themselves, the RED ones are for the calibrated ones and the black ones are before the correction.



    A copy of this log entry has been emailed to: jiang,kalyan,xqian,vasulk



    U1 plane



    V1 plane



    U2 plane



    V2 plane