NEXT
Make New Entry,
Make Followup Entry
User name Chiranjib
Log entry time 23:08:53 on November 24, 2008
Entry number 250614
This entry is a followup to: 250217
keyword=VDC TO calibration for the second period of Production
Following Vince's suggestions and classification of the production run
period triggered by the drift of the T0 of the LHRS VDCs , the
calibration for the second period of the production data has been done.
This period stretches from 12 th Nov to 13 th Nov. The coefficients are
determined and the database file db_L.vdc.dat is updated in the
DIRECTORY 20081113.
The following figures show the time for each plane in ns ( horizontal
axes) .As obvious from the plots themselves, the RED ones are for the
calibrated ones and the black ones are before the correction.
A copy of this log entry has been emailed to: jiang,kalyan,xqian,vasulk
U1 plane

V1 plane

U2 plane

V2 plane
