• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name S. Sirca

    Log entry time 00:03:11 on November25,2008

    Entry number 250618

    keyword=Swing shift SUMMARY


    SWING shift summary: S. Sirca (SL), H. Ding (TO), J.-C. Peng (3rd)
    ==================================================================

    EVENTS
    ------
    16:00 took over from day shift, no beam due to overtemperature fault
    16:10 beam back, resume DAQ
    16:40 problems with hacsbc2 (see halog entry #250582)

    RUNS
    ----
    16:10 run #3871, 1.0M/0.0364C, Happex run #30457
    17:17 run #3872, 0.5M/0.0185C
    17:52 run #3873, 1.0M/0.0365C
    18:55 run #3874, 1.0M/0.0370C
    19:54 run #3875, 1.0M/0.0366C, Happex run #30458
    21:00 run #3876, 1.0M/0.0364C
    22:07 run #3877, 1.0M/0.0370C
    23:06 run #3878, passed on to night shift