NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 00:03:11 on November25,2008
Entry number 250618
keyword=Swing shift SUMMARY
SWING shift summary: S. Sirca (SL), H. Ding (TO), J.-C. Peng (3rd)
==================================================================
EVENTS
------
16:00 took over from day shift, no beam due to overtemperature fault
16:10 beam back, resume DAQ
16:40 problems with hacsbc2 (see halog entry #250582)
RUNS
----
16:10 run #3871, 1.0M/0.0364C, Happex run #30457
17:17 run #3872, 0.5M/0.0185C
17:52 run #3873, 1.0M/0.0365C
18:55 run #3874, 1.0M/0.0370C
19:54 run #3875, 1.0M/0.0366C, Happex run #30458
21:00 run #3876, 1.0M/0.0364C
22:07 run #3877, 1.0M/0.0370C
23:06 run #3878, passed on to night shift