NEXT
Make New Entry,
Make Followup Entry
User name brads
Log entry time 16:13:47 on November 27, 2008
Entry number 251056
keyword=BB Cerenkov beam-right PMTs turned on during run 3978
BB Cerenkov beam-right PMTs turned on during run 3978. Individual PMTs
rates on that side count at the few hundred kHz level with a -100 mV
threshold.
Beamline side PMTs still counting at the few MHz level (roughly 10x the
beam-right side rate).
The first full run with this configuration should be Run 3979.
A copy of this log entry has been emailed to: meziani