• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name E.Chudakov

    Log entry time 13:12:12 on November28,2008

    Entry number 251185

    keyword=Moller tune

    It took about 1h to tune the beam for Moller. It would trip on the EP-chamber. Aligning on 1H01 (lowering from 2mm) in Y was the hardest.

    The energy is locked on Hall C. The Hall A energy reading HALLA:p at 0.5uA is not reliable (see the plot). Judging the arc-2 measurement (ARC2:p) the energy is well locked.


    FIGURE 1

    FIGURE 2