0.00 Continue production running 12uA on 3He,
Field 25 Gauss transverse.
LHRS @ 16 deg., 2.35 GeV/c, polarity -ve
Beam lamda/2 OUT
0.00 Run 4104 Continuation from swing (started 23.46) Q = 0.0392 C
Happex 30494 Continuation from swing
0.40 Run 4105 Production Q = 0.0392 C
1.55 Run 4106 Production Q = 0.0389 C
2.47 Beam continues to be unstable >15 trips last 1/2 hour
However the position on the BPMs is stable
A(0.15, 1.6)
B(-1.5, 1.2)
3.05 Run 4107 Very short...ended as forgot to change Happex run
Negligible Q
3.05 Happex run 30495 started
3.06 Run 4108 Production Q = 0.0392 C
4.10 Run 4109 Production Q = 0.0393 C
5.12 Run 4110 Production Q = 0.0389 C
6.21 Run 4111 Production Q = 0.0392 C
7.26 Run 4112 Production Q = 0.0047 C
7.36 Beam stopped for start of MCC studies
7.41 Happex run 30495 ended
Accumulated production-beam charge 0.279 C