User name M. Iodice
Log entry time 00:38:26 on December 4,2008
Entry number 251945
keyword=SHIFT SUMMARY
Continue production running 12uA on 3He transverse polarization 63.7%
LHRS at 16 deg, 2.35 GeV/c, negative polarity
Beam lamda/2 OUT
BPMA -0.05 / 1.77
BPMB -1.50 / 1.22
16:00 Shift start with PRODUCTION run 4147 ongoing HAPPEX run 30499
16:35 END RUN 4147, Q = 0.03987 C
16:36 START RUN 4148
17:42 END RUN 4148, Q = 0.03981 C
17:42 START RUN 4149
18:50 END RUN 4149, Q = 0.03979 C
18:51 STARTED new HPPEX run 30500
18:52 START RUN 4150
19:07 MCC called for an RF cavity problem. Beam Down probably for more than 10 minutes.
19:10 END RUN 4150, Q = 0.007205 ... for Beam down
19:15 RUN 4151 during beam down taken a run for RICH pedestal
19:24 RUN 4152 COSMICS RUN ...waiting for the beam
20:05 an alarm the Detector Gas System Interlock Status on Low Pressure.
Went in the gas shed and noticed that th Nitrogen bottle was empty and in alarm status.
Also noticed that on the Hall A General Tools panel
the Gas pressure of both Argon and CO2 report negative values
(where ok in the day check list)
Called Jack Segal
20:05 MCC called. Beam is back END cosmic RUN 4152
BPMA -0.05 / 1.74
BPMB -1.50 / 1.20
20:10 START Production RUN 4153
20:30 gas back to normal condition.Jack changed the nitrogen bottles.
Nitrogen cylinders ran out and the gas systems eventually shut down.
21:10 observed decrease of the RICH number of photons. Pedestals analysis show many noisy channels.
Reduced performance possibly due to a bad pedestal run
21:15 MCC called. They have problems with two RF cavities.
21:16 END RUN 4153 for beam down (RF cavities probloems)
22:00 ROC 3 and 4 and then on 8,9,1 rebooted
22:09 START RUN 4160 RICH new Pedestal during beam down (see previous comment)
22:14 END RUN 4160
22:25 MCC called. Problem fixed. Beam will come soon
22:35 Beam is back at 12 uA
BPMA 0.007 / 1.77
BPMB -1.48 / 1.22
22:35 Started new HAPPEX run 30501
22:37 START 4162 production RUN
22:43 MCC called. They take beam back to fix problems related to previous ones
22:44 END RUN 4162 after 117k events
23:30 MCC called ready to give us beam back
BPM are fine
23:34 START RUN 4163
Accumulated production-beam charge 0.169 C