Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name G.M. Urciuoli
Log entry time 08:08:51 on December 5,2008
Entry number 252123
keyword=12/5 owl shift report
00:00
Owl shift starts:
Shift crew:
SL: G.M. Urciuoli
TO: Xiaomei Li
3rd: K. Chirapatpimol
Controll acces in progress to fix DAQ problems.
00:58 DAQ problem fixed. T2 and T3 were swapped.
We ask for 2 uA beam. Raster size 3x4.
Apparently beam position is out of th desired range.
Consequently we asked for the following beam positions:
BPM A (0, 1.7)
BPM B (-1.5, 1.2)
Current configuration:
LHRS momentum = -2.35
LHRs angle = 16
BigBite Sieve OUT
Target Chamber IN
Beam lambda/2 = OUT
Target: Polarized 3He
Runs 4198-4205 junk
Run Number Start Stop Coulomb
4205 1:30 2:07 0.02009
2:09 HAPPEX run 30507 stopped. HAPPEX run 30508 started
Run Number Start Stop Coulomb
4206 2:11 3:09 0.03941
4207 3:09 4:08 0.03953
4208 4:09 5:10 0.03957
4209 5:11 6:17 0.03944
6:17 HAPPEX run 30508 stopped. HAPPEX run 30509 started
4210 6:19 7:24 0.03954
4211 7:25 still in progress